Kelly Anderson
2008-05-09 17:55:19 UTC
In running my data driven tests, when I load the NUnit GUI, it Loads
all the tests. Because of the setup in the IEnumerable DataSources,
this takes about 45 seconds. I then hit run and it reloads all the
tests, taking another 45 seconds, then it runs all the tests, which
takes about 15 seconds.
Can the tests be run immediately on load to avoid the double load?
(There has to be a flag or something I'm missing)
Can the Run somehow detect that it doesn't need to reload? (probably not...)
-Kelly
-------------------------------------------------------------------------
This SF.net email is sponsored by the 2008 JavaOne(SM) Conference
Don't miss this year's exciting event. There's still time to save $100.
Use priority code J8TL2D2.
http://ad.doubleclick.net/clk;198757673;13503038;p?http://java.sun.com/javaone
all the tests. Because of the setup in the IEnumerable DataSources,
this takes about 45 seconds. I then hit run and it reloads all the
tests, taking another 45 seconds, then it runs all the tests, which
takes about 15 seconds.
Can the tests be run immediately on load to avoid the double load?
(There has to be a flag or something I'm missing)
Can the Run somehow detect that it doesn't need to reload? (probably not...)
-Kelly
-------------------------------------------------------------------------
This SF.net email is sponsored by the 2008 JavaOne(SM) Conference
Don't miss this year's exciting event. There's still time to save $100.
Use priority code J8TL2D2.
http://ad.doubleclick.net/clk;198757673;13503038;p?http://java.sun.com/javaone